Solid electrolyte batteries – Hydro-Québec
Project in which Shellex’s expertise was brought forward in the R&D process of a new very high energy density battery technology. A project from Shellex Consulting Group.
Project in which Shellex’s expertise was brought forward in the R&D process of a new very high energy density battery technology. A project from Shellex Consulting Group.
Manufacturing improvements consisted in converting the blowing agents used in the extruded polystyrene foam insulation production to comply with new upcoming regulations. A project from Shellex Consulting Group.
Design and installation of four 5000 USG storage tanks, stainless steel piping and pumps and concrete secondary containment. Project from Shellex Consulting Group.
Design and installation of four 5000 USG storage tanks, stainless steel piping and pumps and concrete secondary containment. Project from Shellex Consulting Group.
Design of four new large letdown tanks and automated pigged transfer piping system to improve production and minimize yield loss. Designed new steel filler platforms and raised penthouse to accommodate larger letdown tanks. Project from Shellex Consulting Group.