Factory Relocation and Construction

As part of its relocation project, Brenntag Canada entrusted Shellex with the engineering and construction of a new site for the transfer of toxic liquefied compressed gases and the production of corrosive liquids. The new site includes several chemical manufacturing processes, ancillary services, two tank truck unloading docks and four tank car stations.

The project also included the addition of six automated stations for filling toxic liquefied gases, two automated chemical filling stations, and the required emission control and safety systems, including an effluent management system.

Do you have a project in mind?

Do not hesitate to contact us. Our team will be pleased to help you bring your engineering projects to life.